close

Subscribe To Newsletter

newsletter

To receive the Gekko newsletter, please enter your contact details

Newsletter

News

Filter by:

129 News Articles Found

News from the Gekko Offices

News from the Gekko Offices
Gekko Systems | 01 July 2011

Our offices have been very busy these last 12 months. Read more

High Performance Consortium

High Performance Consortium
Gekko Systems | 01 July 2011

HPC is a group of manufacturing companies dedicated to improving business capability and systems through a focus on LEAN principles and learning through collaboration. Read more

National Mining Games

National Mining Games
Gekko Systems | 01 July 2011

The Gekko Systems-sponsored University of Ballarat student team was delighted to compete in the AusIMM National Mining Games in Newcastle this year. Read more

IPJ Gangue Rejection and Pre-concentration Plant Results Match CGR Lab Work

IPJ Gangue Rejection and Pre-concentration Plant Results Match CGR Lab Work
Gekko Systems | 01 July 2011

Full scale installations of the InLine Pressure Jig (IPJ) continuous gravity recovery (CGR) circuits at Pirquitas (Silver Standard Resources) and Kloof (Gold Fields) provide further evidence Read more

Positive Recovery Results from Python at Kloof

Positive Recovery Results from Python at Kloof
Gekko Systems | 01 July 2011

Gekko Systems was contracted by Gold Fields in June 2010 to design, build, install and commission a Python 500 modular plant for its Kloof GROWTH project in South Africa. Read more

Gekko’s “CGR” Test Protocol Gains Attention

Gekko’s “CGR” Test Protocol Gains Attention
Gekko Systems | 01 July 2011

Gekko’s technical and metallurgical laboratory teams are leaders in the design of gravity and intensive leach test research programs. Read more

 InLine Leach Reactor

ILR Footprint Grows to 90 Installations
Gekko Systems | 01 August 2010

Demand for the InLine Leach Reactor (ILR) has continued to show strong growth with 90 units being sold since the first commercial installation in 1999. Incredibly, even the prototype unit... Read more

Shane Murphy

New Plant at Three Mile Hill
Gekko Systems | 01 August 2010

Gekko Systems and Como Engineering are pleased to report that the gravity recovery plant at Focus Minerals’ Three Mile Hill Mine in Western Australia has been successfully commissioned... Read more

Morning Star Gold modular plant

10 tph Modular Plant for Morning Star Gold
Gekko Systems | 01 August 2010

In early 2010, Gekko Systems was contracted to design and manufacture a 10 ton-per-hour pre-concentration modular gold plant for Morning Star Gold to install at its exciting Woods Point... Read more

Gekko Gold Fields metallurgical team

Gold Fields Invests in Python Technology
Gekko Systems | 01 August 2010

The Gold Fields metallurgical team has placed an order for a number of Gekko’s innovative processing systems with a view to achieving high gold extraction rates from existing surface dumps.. Read more

Pages

To Top